Project Summary

TI Sparkle, the first international service provider in Italy and among the top ten global operators, announces the launch of Metamorfosis II, the first “green” data center in Greece with LEED Gold and ISO14001 certifications awarded. The total power is 7.7 MW  for a maximum capacity of 700 racks in six modules in 5,831 m²  total space.

Achievements


Uptime Institute Tier III Certification awarded based on fully redundant control system by Extrabit
Delivery of complete project within very limited time frame   
Green Building certification by LEED (Gold)

Client: TI Sparkle  

TI Sparkle Greece S.A. is part of Sparkle Group, a leading global telecommunication provider offering a full range of ICT solutions, global connectivity, services and capabilities through a state-of-the-art- backbone of over 600,000 kilometers worldwide.

Sparkle’s Mediterranean submarine network spans over a distance of approximately 11,000 km linking Italy, Greece, Cyprus, Turkey and Israel. Throughout these countries and specifically in the cities of Catania, Athens (Metamorfosis and Koropi), Chania, and Istanbul, our company has privately owned Data Centers.

TI Sparkle Greece manages and operates the entire infrastructure within the country, including the backbone network and four data centers: Metamorfosis, Metamorfosis II, Koropi in Athens, and Chania in Crete.

The need

Launched in 2021, the new data center offers about 6,000 m² of space and a modular design to accommodate. It is designed to guarantee the maximum standards of reliability and performance while minimizing its impact on the environment, thanks to the adoption of the latest energy-efficient power and cooling systems available in the market. Therefor an extensive Building Automation System was a requirement in order  to secure at maximum all the data center operations and the 99.999% off power availability, which is one of the best in class in Europe.

Extrabit was awarded the final design and build of the Building Automation System and the Energy Management System of the data center.

Where

The new data center  accommodate the needs of customers seeking to expand their presence in the industrial area of Metamorfosis Attiki - Greece

Key Technical Features

Assets Under Management (AuM):  

2 Medium Voltage Transformers
2 Power Generators with the fuel infrastructure control
Data Center Cooling system with the water distribution infrastructure control
UPS system
White Space monitoring
Energy Management System

Total Hardware Inputs/Outputs more than 5000 IOs

Back to topBack to projects

More on transportation

IntelliLight - Smart Street Lighting

IntelliLight stands as a revolutionary endeavor at the intersection of highways infrastructure and cutting-edge technology with Advanced Predictive Analytics.

Read more

Interested in seeing how automation can optimise your business process and leverage your data?

Book a call